Crossings without casing ought to be produced by trenching. The Executor need to open up the trench only following the pipeline segment applicable for the crossing is prepared. Prior to opening the trench, the Executor must have welded the crossing pipeline area to get laid. Like earth excavation, this is the type of excavation based on content,